Source-linked briefing World

Osijek’s €13.5m Copacabana Pool Revamp to Open by Mid-June

Osijek’s €13.5m Copacabana Pool Revamp to Open by Mid-June

The reconstruction of Osijek’s Copacabana pool complex is in its final phase, with reopening expected in mid-June ahead of the summer season. The mayor toured the site with local civil engineering and architecture students as part of EU-themed activities.

Original headline

Osijek’s €13.5 million Copacabana redevelopment to open ahead of summer season