The briefing
The Department of Energy said five generating units totaling 654 MW are slated to return to service this September, which should stabilize the Visayas grid. The added capacity is expected to reduce ongoing rotational brownouts in the region.
Original headline
Visayas grid to stabilize as 5 power units return soon - DOE