The briefing
Engineers report rock blasting in Thomson and tunnelling within a metre beneath the existing North–South Line as the project advances. The Land Transport Authority says these obstacles are slowing progress on one of Singapore’s largest transport corridors.
Original headline
North-South Corridor construction enters its 'most challenging phase': LTA